Nursing Room Building Standards: Area Rules Explained

2026-10-05 23:00:00

Click:

Introduction:In January 2026, 16 departments including the Beijing Municipal Health Commission and the Municipal Development and Reform Commission jointly issued the Beijing Measures for the Construction and Management of Maternal and Infant Facilities. Two provisions drew the most attention:third-gender/family restrooms or toilets must not substitute for nursing rooms, and venues with a floor area above 10,000 m² or daily foot traffic above 10,000 people may set up independent nursing rooms with a usable area of no less than 4 m² at multiple points. More importantly, Article 7 (Item 2) of the Measures states explicitly — “the location and number of lactation pods may be adjusted according to holidays, passenger flow and other conditions”. This is the first time “lactation pods” have entered a local government regulation in formal wording. This article strings the 2016 national guidance, the 2021 promotion action plan, the 2026 Beijing Measures and the Taizhou regulation into one policy timeline, and breaks down item by item the nursing room building standards, nursing room area requirements and the configuration checklist, and explains where lactation pods fit — and which locations they do not.

First, a background figure: a survey by the China Development Research Foundation found that 60% of mothers go out less because breastfeeding away from home is inconvenient, and nearly 30% switch from breastfeeding to formula as a result. Nursing facilities are not optional; they are threshold infrastructure that decides whether families with young children can normally use urban public services.

Note on terminology: the Chinese regulations use the term 移动母婴室 (literally “mobile nursing room”). In English this product category is most often searched as a lactation pod or nursing pod, so this article uses “lactation pod” throughout.

1. Policy Timeline: A Decade of Nursing Rooms, From “Encouraged” to “Hard Requirement”

Standards for nursing rooms in public places in China have been tightened layer by layer through three documents. Only by understanding this timeline can you judge where today’s procurement demand comes from.

  • November 2016 | National Health Commission Guidance (Guo Wei Zhi Dao Fa [2016] No. 63)— Ten departments led by the former National Health and Family Planning Commission issued the Guidance on Accelerating the Construction of Maternal and Infant Facilities, clarifying for the first time at the national level that “transport hubs, commercial centers, hospitals, tourist attractions, leisure and entertainment venues and other public places frequently visited by mothers and infants, with a floor area above 10,000 m² or daily foot traffic above 10,000 people, shall build independent nursing rooms with a usable area generally of no less than 10 m²”, together with a recommended basic configuration standard.
  • November 2021 | Breastfeeding Promotion Action Plan (2021–2025)— Jointly issued by 15 departments including the National Health Commission, it set an 80%+ configuration rate of maternal and infant facilities in public places as a quantitative target, and required all employers that should provide such facilities to basically complete standardized nursing facilities.
  • December 30, 2025 | Beijing Measures for the Construction and Management of Maternal and Infant Facilities— Jointly issued by 16 departments including the Municipal Health Commission, the Municipal Civility Office, the Women and Children Working Committee Office and the Municipal Development and Reform Commission, in 15 articles. For the first time, “no substitution of nursing rooms by family restrooms” was written into an explicit clause, and three area tiers of 4/6/10 m² were established.
  • 2026 | Local Legislation Follows— The Taizhou Municipal Regulation on the Construction and Management of Maternal and Infant Facilities came into force as a local regulation with 18 articles, bringing “environmental comfort” (soft, warm decor tones and suitable temperature and humidity) into statutory requirements, and stipulating that funding for nursing facility construction and management be included in fiscal budgets.

From “guidance” to “management measures” to “local regulation”, binding force rises step by step. For venue operators, nursing rooms have shifted from a “bonus item” to a mandatory inspection item in civilized-city assessments and opening acceptance; for buyers, this is rigid demand with budget explicitly written in.

2. The National Baseline: The 10 m² Threshold and Eight Basic Items

Guo Wei Zhi Dao Fa [2016] No. 63 remains the baseline reference at the national level. Its nursing room area requirement is “generally no less than 10 m²”, accompanied by a recommended configuration standard for maternal and infant facilities in public places, split into “basic configuration” and “comfort configuration” tiers. The basic list is the common source of later local standards; item by item:

  • Non-slip flooring;
  • A baby changing table with safety straps (also called a baby care station);
  • Seating suitable for breastfeeding and rest;
  • A washbasin with hot water and hand soap;
  • A crib;
  • Power outlets (safety sockets);
  • A trash bin;
  • A lockable door or curtain screening to protect breastfeeding privacy.

This list is in effect the earliest prototype of a configuration standard for nursing rooms in public places. The document also requires “unified signage for maternal and infant facilities, with clear and visible wayfinding signs”. Note that the 2016 compliance threshold was “a floor area above 10,000 m² or daily foot traffic above 10,000 people” — the origin of the three area tiers in the new Beijing rules.

One more reality check: China’s nursing room construction specifications have long existed in a state where “national, industry and local standards coexist”. At the national level, GB/T 33855—2017 (General Requirements for Maternal and Infant Health Care Service Premises) mainly targets postpartum care centers and similar service providers, not public nursing rooms. At the industry level, the Ministry of Housing and Urban-Rural Development released a national building standard design atlas for nursing rooms in 2023 as a technical reference for building design. At the local level, Zhejiang, Jiangsu, Guangdong and other provinces each have their own standards. Industry practitioners regard the Beijing Measures as currently the most systematic local nursing room construction specification in China, but it remains a local standard — no unified national standard has yet formed. Companies operating across regions must check the rules of each project location one by one; one set of standards cannot be applied nationwide.

How has execution gone? In its reply to Proposal No. 6113 of the Second Session of the 13th National People’s Congress, the National Health Commission reported that by the end of 2018, the configuration rate of maternal and infant facilities in eligible public places nationwide had reached 88.3%, exceeding the 80% stage target. But “configuration rate” measures whether facilities exist, not whether they work — which is exactly why the 2026 local rules pivot to “managed well”.

3. The 2026 Beijing Rules: Five Changes You Must Know

The Beijing Measures (full name: Beijing Municipal Measures for the Construction and Management of Maternal and Infant Facilities) are grounded in Article 29, Paragraph 2 of the newly revised Population and Family Planning Law of the PRC (2021): “Public places and employers with relatively many female employees shall provide maternal and infant facilities to facilitate infant care and breastfeeding.” This provision upgraded nursing facilities from “policy encouragement” to a “statutory obligation”. Five provisions in the Measures directly concern venue operators and buyers:

Change 1: It Is Now Explicit That “Family Restrooms Must Not Substitute for Nursing Rooms”

The Measures allow public places to set up third/family restrooms with baby care facilities where needed, but such restrooms or toilets must not substitute for nursing rooms, baby care rooms and similar facilities. In the past, many venues reported the baby care table inside a family restroom as a “built nursing room”. The new rule directly closes that loophole — the path of using a family restroom as a nursing room no longer works; a separate dedicated space must be built.

Change 2: Area Split into Three Tiers — 4/6/10 m²

Nursing room area is generally 4–10 m². Public places frequently visited by mothers and infants with a floor area of 5,000–10,000 m² shall build an independent nursing room with a usable area of no less than 6 m²; venues with a floor area above 10,000 m² or daily foot traffic above 10,000 people shall build a nursing room with a usable area of no less than 10 m²,or set up multiple independent nursing rooms or baby care rooms with a usable area of no less than 4 m² each at different points. The “multiple 4 m² rooms” option is the most practical relaxation in the new rules for existing venues.

Change 3: “Deploying Lactation Pods” Enters Government Regulation for the First Time

Article 7 (Item 2) of the Measures requires that large public places, following the principle of convenient infant care, choose suitable spots (ensuring privacy, quietness, hygiene and safety) and may set up multiple independent nursing rooms, baby care rooms and similar facilities;“the location and number of lactation pods may be adjusted according to holidays, passenger flow and other conditions”.

The significance of this sentence is that it acknowledges the tidal nature of nursing demand — holiday, school-vacation and big-event traffic peaks differ hugely from ordinary days. Fixed construction cannot move with the crowds, while the regulation explicitly allows “adjusting the location and number of lactation pods”, effectively opening a compliance channel for movable container-style nursing rooms: they can serve as supplementary spots alongside new fixed rooms and be temporarily added at peak times.

Change 4: Emergency Response Must Be Wired into the Security System

The Measures require public place managers to add a nursing room emergency response mechanism to their existing security systems, with emergency call buttons connected to the customer service center or security center and relevant service staff; when a user of the nursing room feels unwell, service staff shall help them obtain medical help or on-site assistance.Unattended nursing rooms must publish the nursing facility emergency phone number in a prominent area. This means “unattended” operation is explicitly recognized, but the supporting emergency call chain must be in place — for buyers, nursing room call equipment has turned from an option into a mandatory inspection item.

Change 5: Seven Types of Venues Are Named as “Must Build”

The Measures name the venue types that shall build nursing rooms, covering finer detail than the 2016 national document:

  • Shopping centers, department stores and other large commercial outlets;
  • Airports, railway stations, long-distance bus stations, highway service areas and transport hubs;
  • Maternity medical institutions, children’s specialty hospitals, general hospitals with pediatrics, and medical institutions with child health clinics;
  • Cultural, sports and event venues;
  • Tourism and leisure places such as scenic areas, parks, gardens and amusement parks;
  • Large community public service or administrative venues such as community health service centers;
  • Other public places that need nursing rooms.

The Measures also require nursing rooms to be located where people and strollers can easily enter and exit; rooms on the second floor or above should consider barrier-free design; nursing rooms should have good ventilation and daylighting and an independent entrance/exit; and doors, windows and breastfeeding areas should adopt necessary privacy protection. One technical detail is worth noting:where site constraints force breastfeeding facilities to adjoin a public restroom, their entrances must be staggered and non-interfering, to prevent air from inside the restroom flowing into the breastfeeding area — such ventilation and airflow requirements are exactly the hardest part of retrofitting fixed buildings.

4. How to Size It: Matching the 4/6/10 m² Tiers

Organizing the clauses above into a comparison table, venue operators can self-check which tier they fall into:

Venue conditionRequired independent nursing room areaAlternative options
Floor area below 5,000 m²
(general requirement)
Generally 4–10 m², determined by actual needsSet up 1 independent nursing room
Frequent mother-and-infant visits, and floor area 5,000–10,000 m²Usable areano less than 6 m²Set up 1 independent nursing room
Floor area above 10,000 m², or daily foot traffic above 10,000Usable areano less than 10 m²or multiple independent nursing rooms/baby care rooms of no less than 4 m² each at different points
Holidays, large events, traffic peaksTemporarily add spots based on actual demandAdjust the location and number of lactation pods

The last tier is the new flexible clause and the easiest to overlook. For large venues already built, where no further construction work is possible, the two options “multiple 4 m² independent nursing rooms” and “peak-time deployment of lactation pods” untie the old knot of “only one big room possible”.

Honeycomb Era Lactation Pod MR3.0 front view, pearl-white container, used as a supplementary nursing room spot in public places

Lactation Pod MR3.0: Integrated container, no construction work needed, plug into 220V and ready to use

5. Nursing Room Configuration Checklist: Policy Requirements Broken Down

Merging the 2016 national guidance with the 2026 Beijing Measures, an executable nursing room configuration checklist comes to roughly these ten items. The right-hand column of the table lists the corresponding components in a movable container-style solution, for item-by-item procurement checks:

Configuration item required by policyPolicy sourceCorresponding component in the mobile solution
Baby changing/care table with safety straps2016 guidance, basic configurationHDPE eco-friendly plastic baby care table with safety straps, foldable
Seating for breastfeeding and rest2016 guidance, basic configurationNursing sofa chair, breathable cotton-linen fabric + full sponge padding, 80 cm wide seat
Washbasin with hot water and hand soap2016 guidance, basic configurationMobile sensor-operated washbasin, sensor tap with plug-in power, built-in 10L fresh/waste water tanks, no external plumbing needed
Quick hand sanitizer2026 Beijing MeasuresTouchless hand sanitizer dispenser
Safety power sockets2016 guidance + Beijing Measures3 multi-function sockets with leakage, short-circuit and grounding protection switches
Lidded trash binBeijing MeasuresStorage side cabinet with built-in odor-sealed trash bin and waste drop opening
Call device / emergency call buttonBeijing Measures emergency clausesEmergency call bell, connectable to the venue’s customer service or security center
Lockable door, privacy protection2016 guidance + Beijing MeasuresInside-outside electromagnetic door lock + mechanical inner lock to prevent accidental opening; outdoor “occupied/vacant” status display
Good ventilation and daylightingBeijing Measures2 ventilation systems (ceiling fan + dual-impeller auto-circulation air exchanger); infrared-sensing LED warm light strip
Non-slip flooring2016 guidance, basic configurationWood-grain soft rubber mat
Baby care table and baby safety chair inside the lactation pod, HDPE eco-friendly plastic with safety straps, foldable

Baby care table and baby safety chair: HDPE eco-friendly plastic, with safety straps, foldable

Nursing sofa chair and storage side cabinet (with built-in odor-sealed trash bin) inside the lactation pod

Nursing sofa chair (80 cm seat width) + storage side cabinet (with built-in odor-sealed trash bin)

One reminder: the policy text specifies a washbasin “with hot water and hand soap”. Mobile solutions are limited by on-site water supply; most use sensor washbasins with built-in water tanks — no plumbing connection needed, with water refilled and exchanged periodically — but they usually do not provide hot water. If the project is a maternity medical institution or another setting with a hard hot-water requirement, confirm it separately in the procurement documents and, where necessary, switch to a fixed water point + mobile container combination.

Mobile sensor washbasin, touchless sanitizer dispenser and wall-mounted tissue box inside the lactation pod

Mobile sensor washbasin: built-in 10L water tanks, no external plumbing needed

6. Five Common Compliance Failures — Self-Check Before Bidding

  • Substituting a family restroom.This is the practice explicitly banned by the new Beijing rules. A family restroom may include baby care facilities, but it cannot replace a nursing room or baby care room itself. Self-check: does the nursing room have an independent entrance and independent door lock?
  • Area below standard, or no proof of usable area.Note the clause says “usable area”, not floor area. Container-type equipment should be able to provide internal clear dimensions (length × width) as evidence of usable area, rather than only external dimensions.
  • Breastfeeding area adjoining a restroom with shared airflow.The Beijing Measures require staggered, non-interfering entrances in such cases, precisely to keep restroom air out of the breastfeeding area. Retrofit projects most often fail here.
  • Unattended, with no emergency phone published.The Beijing Measures explicitly require unattended nursing rooms to publish the nursing facility emergency phone number in a prominent area and to connect the emergency call button to the customer service or security center. Many newly delivered nursing rooms miss this step.
  • Missing signage and wayfinding.Nursing rooms should use the prescribed signage, with complete, clear, prominent wayfinding signs at the entrances of the public place. “Can’t find it” is the top reason for low usage — and a deduction at inspection.

7. Procurement Signals: What “Mobile Caring Nursing Room” Awards Tell Us

The most direct evidence of policy landing is procurement announcements. Public information shows this demand had already formed sizable transactions in 2026:

  • The labor union system’s “mobile caring nursing room” equipping services.In April 2026, the labor union committee of Dongfeng Motor Group issued a request-for-comparison procurement announcement for “mobile caring nursing rooms”. The procurement overview states that, to further strengthen care for female employees, the company’s women workers committee decided to roll out mobile caring nursing rooms across the whole company, equipping grassroots units on site; the award result was announced in June, with a single bid section won at RMB 39,980. Buyers in such projects span multiple grassroots units — a typical “multi-spot, small-batch, fast-delivery” demand.
  • Maternal and child health institutions’ “mother-baby medical care centers”.In June 2026, the mobile furniture project for the Mother-Baby Medical Care Center of Zhoukou Maternal and Child Health Hospital (Zhoukou Children’s Hospital) was awarded through competitive consultation, with a winning amount of RMB 1,238,118.
  • Local fiscal support.The Taizhou Municipal Regulation explicitly requires city- and county-level governments to include nursing facility construction and management funding in fiscal budgets, coordinate subsidy funds, and encourage employers to set up nursing rooms to public-place standards and open them to society.

Putting these three signals together shows a clear path:the nation sets the baseline → local legislation tightens → unions and institutions commit budget. The labor union system says “mobile caring nursing room”, government documents say “nursing room”, “baby care room” and “maternal-infant care room”, while the medical system often says “mother-baby medical care center” — the keywords in procurement documents differ, but they all point to the same kind of independent, private, deliverable nursing space.

For suppliers, this means keyword coverage cannot bet on a single name. For buyers, note that “caring nursing room” projects often require “each nursing room installed within a set number of calendar days” — delivery speed itself is a scoring item, and it directly affects whether you choose fixed construction or a movable container.

8. Lactation Pod Fit: Which Spots Suit It and Which Do Not

Return to the new regulatory wording quoted at the start of this article — “the location and number of lactation pods may be adjusted according to holidays, passenger flow and other conditions”. It gives movable solutions compliance space, but it does not mean they can replace all fixed nursing rooms. Clarifying the fit boundary is more valuable than blanket claims of “it works everywhere”.

Three types of spots that fit

  • Supplementary spots for large, already-compliant nursing rooms.The venue has built a 10 m² main nursing room to standard, but floors span widely, walking routes are long, and queues form at peak times. Adding an independent small unit on a far floor follows the “multiple points” approach and directly improves service accessibility.
  • Existing venues where no construction work is possible.The building is already in use and structurally constrained, with no free 4–10 m² room available, or the breastfeeding facilities can only adjoin restrooms (ventilation and airflow hard to handle). Container-style solutions come with an independent entrance and their own ventilation system, and can be placed in non-building spaces such as outdoor corridors, rooftop platforms and parking lot corners.
  • Tidal-traffic scenarios.Scenic areas, highway service areas, convention centers, stadiums and large promotional events see huge gaps between holiday and ordinary-day traffic. Sizing fixed rooms for the peak wastes utilization; sizing for ordinary days leaves peaks underserved — deployable mobile spots match this fluctuation far better.

Three boundaries that must be stated honestly

When selecting a lactation pod manufacturer, buyers should ask for written answers on the following three items rather than verbal promises: proof of internal clear dimensions, whether the call equipment can connect to the venue’s security system, and the anti-corrosion and coating process standards of the steel container.

  • How single-room usable area relates to the 4 m² threshold.The “4 m²” in the Beijing Measures means “usable area of no less than 4 m²”. Take a single-cabin movable nursing room like the Honeycomb Era MR3.0: external dimensions of 2000×1560×2300 mm correspond to a footprint of about 3.1 m², and internal clear dimensions of 1800×1500×2000 mm correspond to a usable area of about 2.7 m², below the 4 m² tier threshold. Its correct positioning is therefore “spot supplementation and flexible deployment”, not “replacing a 10 m² main nursing room with a single cabin”.If the tender document hard-codes a single-room usable area of ≥4 m², an OEM/ODM custom build with a larger container is required — this must be confirmed with the factory before quoting; do not wait until the bid deadline to discover non-compliance. Note that how “usable area” is measured in the tender, and whether internal clear dimensions are accepted, are themselves clarification points you can directly raise.
  • Use is mainly indoors.Container products are usually labeled “for indoor use”; open-air sites are unsuitable. For semi-outdoor spots, pair with a rain canopy or choose a sheltered location, subject to factory confirmation.
  • Power supply and installation conditions.Mainstream solutions run on an external 220V three-pin socket with a 1.5 m external power cord — no construction work needed; but the site still needs to reserve a power access point and ensure a forklift or crane working area can reach the spot. Where door height limits entry, shipping in parts and assembling on site per factory drawings is available.

9. Landing Path: A 4-Step Execution Checklist

  • Step 1: Determine your tier (1–2 working days).Use the Section IV table to confirm which tier the venue falls into — floor area range, average daily traffic, and whether it belongs to the seven must-build venue types. Also confirm whether this is a “required but not yet built” case or an “already built, needs upgrading” case.
  • Step 2: Site selection and compliance self-check (3–5 working days).Check six items for each spot: independent entrance and door lock, privacy protection, ventilation and daylighting, adjacency to restrooms, stroller accessibility, and barrier-free design for floors above the second. Where an existing venue cannot satisfy them, re-list that spot as a “multiple points” or “deployable mobile spot” candidate.
  • Step 3: Set the configuration and write procurement parameters (5–10 working days).Implement the Section V checklist item by item, and write three things into acceptance-testable clauses: ① usable area (require internal clear dimensions; external dimensions alone not accepted); ② call equipment and the emergency phone chain (connected to the customer service/security center or not); ③ the specific form of ventilation and privacy protection. For wet spots, confirm hot-water requirements separately — mobile washbasins generally provide no hot water.
  • Step 4: Delivery and acceptance (mobile containers: regular lead time about 14 days, depending on capacity and customization).Confirm the delivery method (fully assembled or in parts), on-site working conditions, the warranty period (MR3.0 standard configuration: 12 months) and spare-parts supply, and reserve a “peak deployment plan” — specifying the spots, quantities and transport for holiday additions.

A reference note on the supplier

Shenzhen Honeycomb Era Technology Co., Ltd. is a full-industry-chain smart manufacturing service provider of shared power banks and battery swap cabinets. Its Shenzhen headquarters production base covers 10,000 m² and has the industry’s first automated shared power bank production line, with fully in-house production from mold making and injection molding to SMT placement and assembly. Its sheet-metal production base in Xuzhou, Jiangsu sits in a 270,000 m² industrial park covering sheet metal, spraying, molds, injection molding, cables and assembly; the sheet-metal and spraying capabilities for steel container manufacturing can be reused for the lactation pod product line. The company has a hardware-software R&D team of 30+, holds 60+ utility model, invention and design patents, serves 100+ OEM/ODM brand clients worldwide, exports to 100+ countries and regions, and supports whole-unit wholesale and OEM/ODM customization.

For the product parameters, configuration details and customization notes of the Lactation Pod MR3.0, see the Lactation Pod MR3.0 product page; for the factory lines and QC process, see Inside Honeycomb Era’s 10,000 m² Smart Manufacturing Base.

Lactation pods in batch production at the Honeycomb Era smart manufacturing base, steel containers made in-house, OEM/ODM supported

Lactation pods in batch production: steel containers made in-house, supporting whole-unit wholesale and OEM/ODM customization

Honeycomb Era finished lactation pod, wood-grain finish with side panels, modular container with no construction work, plug into 220V

Finished lactation pod units: modular container, no construction work, plug into 220V, regular lead time about 14 days

10. Recommended Reading

1. Japan’s Nursing Room Gap: Why Lactation Pods Fit a Record Inbound Market

2. Japan Shared Power Bank Market: Blue-Ocean Opportunity, PSE Compliance and Landing Plan

3. GB 47372-2026 Power Bank New Standard: Five Upgrades and the 15% Cost Impact

4. Lactation Pod MR3.0

11. FAQ

How big should a public nursing room actually be — 4 m² or 10 m²?

It depends on the tier. The 2016 national guidance baseline requires venues “frequently visited by mothers and infants with a floor area above 10,000 m² or daily foot traffic above 10,000” to build an independent nursing room with a usable area generally of no less than 10 m². The 2026 Beijing Measures refine this into three tiers: generally 4–10 m²; venues with floor area of 5,000–10,000 m², no less than 6 m²; venues with floor area above 10,000 m² or daily foot traffic above 10,000, no less than 10 m², or multiple independent nursing rooms/baby care rooms of no less than 4 m² each at different points.

Does a family restroom with a baby care table count as a nursing room?

No. The 2026 Beijing Measures explicitly allow public places to set up family restrooms with baby care facilities, but such restrooms or toilets must not substitute for nursing rooms or baby care rooms. The test: a nursing room must have an independent entrance, a lockable door and privacy protection.

Are lactation pods really recognized by policy?

Yes, in explicit wording. Article 7 (Item 2) of the 2026 Beijing Measures states that “the location and number of lactation pods may be adjusted according to holidays, passenger flow and other conditions” — the first formal appearance of “lactation pod” in a local government regulation. Its compliance positioning is a supplementary spot and peak-time flexible option for fixed nursing rooms.

Can one lactation pod reach the 4 m² usable-area threshold?

It depends on the specific model — no generalization. Take a single cabin like the Honeycomb Era MR3.0: external dimensions of 2000×1560×2300 mm mean a footprint of about 3.1 m² and an internal usable area of about 2.7 m², below the 4 m² tier. It is therefore suited to spot supplementation and flexible deployment, not to replacing a 10 m² main nursing room; if the tender hard-codes a single-room usable area of ≥4 m², an OEM/ODM custom larger build is required.

What is the installation and delivery lead time for a lactation pod?

Mainstream container solutions need no construction work: factory-prefabricated and delivered whole, ready to use once connected to a 220V three-pin socket on site; where door height limits entry, ship in parts and assemble on site per the manufacturer’s drawings and tools. Regular lead time is about 14 days, depending on landing requirements, customization and the manufacturer’s stage capacity; some procurement documents require “each nursing room installed within a set number of calendar days”.

From: Honeycomb Era
0
Nursing Room Building Standards: Area Rules Explained
Long by picture save/share

Honeycomb Era


Copyright © Shenzhen Honeycomb Era Technology Co., Ltd. All Rights Reserved. Guangdong ICP Filing No. 2026073193.

TeL:+86 159 1998 0051

E-mail:wr@fengwoshidai.com

WhatsApp:+86 159 1998 0051

Honeycomb Era 


TeL:+86 159 1998 0051

WhatsApp:+86 159 1998 0051

E-mail:wr@fengwoshidai.com

Add:Room 401, Building 61, Longwangmiao Industrial Area, East Zone, Baishixia Community, Fuyong Street, Bao'an District, Shenzhen, Guangdong, China

Copyright © Shenzhen Honeycomb Era Technology Co., Ltd. All Rights Reserved. Guangdong ICP Filing No. 2026073193.
在线咨询
TOP
在线咨询
Online Contacts Qrcode
热线电话
400-12346578
上班时间
周一到周五
E-mail地址
123456@qq.com
Qrcode
扫码关注
TOP
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.